January 5th, 2016
After getting home from the office and getting into some better suited clothing, I headed straight to the brightwork. I sanded all surfaces of the toe rails, rub rails, coaming boards, and miscellaneous trim with 220-grit paper. After hand-sanding the brightwork, I wiped the surfaces with a clean rag dampened with a solvent. Finally, I prepared a cup of Epifanes varnish, thinned by roughly 10%, and applied to the brightwork. The picture below captures the toe rails after the first full coat of varnish.
Total Time: 2 Hrs.
No comments:
Post a Comment